Building

A deeply rooted project management background allowed us to actualize a challenging project, chasing every single step thanks to a complete and integrated management of authorizations and planning progress.

The construction of an industrial building into a contaminated area with a remediation process ongoing and simultaneously affected by a concrete rockfall risk could seem an extremely difficult idea to make real, but, thanks to the synergy between our working groups we got successful to contemporary manage both managerial and planning commitment, getting the whole area free of any environmental and geological hurdles, while a third team was focused on the building project.

Our qualifications

Linked projects

SAMPLING OF MATERIALS CONTAINING ASBESTOS

Characterization is the fundamental activity for mapping and identifying possible sources of Asbestos Containing Materials (ACM), ideal for planning remediation and demolition activities without losing sight of costs.

New Seismic-Geoelectric instrumentation

Zulberti S.r.l. has updated its instrumentation to carry out non-invasive subsoil tests. The new instrumentation allows you to carry out MASW and HVSR tests, active seismic refraction prospecting and geoelectrical investigations.

ECOMONODO 2023 – EXPLORING THE FUTURE OF ENVIRONMENTAL GEOLOGY

Within the multiple services offered at Ecomondo fair 2023, at Zulberti SRL we are committed to pursuing our vision: ensure the well-being of those employed in the environmental geology sector and actively contribute to environmental protection. Our uniqueness is due to this duplicity, which is connected with a particular focus on the remediation of environmental damage.